Industry News
Home/News/Industry News

Submersible Sewage Pump Installation

2024-Dec-31

Installing a submersible sewage pump is an important job that requires careful planning and execution. How can you ensure an efficient and successful installation of a submersible sewage pump?

Site Preparation

The careful preparation of the site is the first step in installing a submersible sewage pump. The pump will only be able to function effectively and reliably over the course of its lifespan if this fundamental phase is completed.

Choosing Best Place

First things first, choose the best spot for the pump installation. The chosen location should be level and easy to get to, making it easy to install and keep it up in the future. It is essential to check the surrounding area for any potential obstacles, such as trees, rocks, or existing structures, that could make it difficult to maintain the pump or impede its operation. In addition to making it easier to get to, a clear area helps prevent any interference with the pump's performance.

Getting Groundwork Ready

Once you have chosen a location, the next step is to build a solid foundation for your submersible pump. This may involve pouring a concrete foundation or digging a sump, depending on your needs and the design of your wastewater treatment system. If you choose a sump, make sure the pit is deep and wide enough to properly accommodate the pump while ensuring that water can flow smoothly.

The foundation must be strong enough to effectively support the weight of the pump and the various dynamic loads it creates during operation. A solid foundation can effectively reduce vibration and prevent potential damage, thereby extending the life of the pump.

Verify electrical and plumbing connections

Before the actual installation, it is important to confirm the integrity of the plumbing infrastructure and electrical connections. Make sure that the installation site has easy access to a reliable power source and that there is enough space for the pump's inlet and outlet pipes to connect to the sewage system.

Preliminary planning and preparation will lay a solid foundation for the subsequent installation process, saving you valuable time and energy and avoiding potential trouble that may be caused by insufficient site preparation.

Pump Selection

When choosing a submersible sewage pump, consider the flow rate, head and solid handling capacity, which should be determined based on the amount of waste and the requirements of the sewage system.

Environmental conditions are also important, and consider the operating temperature of the pump, the pH of the sewage, and whether there are corrosive substances in the waste stream. Choosing a pump that can adapt to these conditions can ensure long-term stable operation.

If you are unsure about how to choose the right pump, you can consult a professional or manufacturer who can provide useful advice to help you make an informed decision.

Installation

Once the site and pump are ready, you can start installing it. Make sure the pump is in the right place and connected securely.

First, place the pump securely on the foundation. If you are using a concrete pad, bolt or bracket it as the manufacturer says. If you are installing it in a sump, make sure it is flat and secure at the bottom of the pit.

Then, connect the inlet and outlet pipes of the pump. Use the right washers and fittings for the joints to ensure they are secure and leak-proof. The inlet pipe should be aligned with where the sewage is coming in, and the outlet pipe should follow the direction of the water flow. After connecting, take a good look at each joint to ensure they are secure and aligned.

Speaking of electrical connections, this is the most important part of submersible sewage pump installation. When connecting the power cord to the socket or control panel, you must strictly follow the manufacturer's instructions and comply with local electrical safety regulations. If you feel that you are not able to handle electrical installation, it is best to find a professional electrician to do it. Safety comes first.

Grounding plays a vital role in the safe operation of submersible sewage pumps. Always check that the pump body is properly grounded to prevent electrical accidents and protect the equipment from damage. If you are not familiar with the grounding procedure, please seek the assistance of a professional.

After completing the installation of the pump and all connections, system testing and commissioning are required, which is the last step to ensure that the pump can work properly.

First, start the pump and observe its operation. Check for any abnormal leaks, vibrations, or noises around it. The pump should run smoothly and quietly. If any problems are found, stop the pump immediately and find out the cause.

Second, make sure the pump can effectively transport sewage. Observe the flow of sewage at the inlet and outlet, and measure the flow rate whenever possible to ensure that it meets the design requirements.

Depending on your pump model, you may need to make some setting adjustments, such as adjusting the impeller clearance or setting the float switch to automatic operation. Before making any adjustments, read the pump manual carefully and follow the recommendations.

Finally, complete all commissioning steps required by the manufacturer or local regulations. Installation, performance testing, and initial operating parameters may all need to be recorded. Proper commissioning will ensure long-term, reliable operation of your pump.

Tianjin Kairun is a well-known manufacturer that provides customized services to meet various needs. We are professional in pump manufacturing and can be contacted at catherine@kairunpump.com.

References

1. Grundfos. (2021). "Submersible Sewage Pumps Installation and Operating Instructions."

2. Franklin Electric. (2020). "Wastewater Pumps Installation Manual."

3. Xylem Inc. (2022). "Flygt Concertor Installation, Operation, and Maintenance Manual."

4. Sulzer Ltd. (2021). "ABS Submersible Sewage Pump Installation and Operating Instructions."

5. KSB SE & Co. KGaA. (2022). "Amarex KRT Installation/Operating Manual."